2026-04-30
EvidenceV26 Tiny-LLM ROM-slice physical closure completed
Integrated four-ROM reduced Tiny-LLM slice into Caravel top RTL and regenerated wrapper/example GDS with passing hardening and smoke checks.
NeuroEtch
Loading
This frontend now tracks the current program state: V26 ROM-slice physical closure, full-model scope gates, and packaged fabrication collateral with explicit verification provenance.
NeuroEtch Stack
A public narrative around a hardware program that treats model structure, evidence quality, and manufacturing constraints as one system.
Focus
Latency-first inference
Lever
Two-mask specialization
01 · Reference Envelope
17k TPS
Architecture target from the HCI reference model used across project docs.
02 · Precheck Coverage
13/13
Latest local `cf precheck` run recorded all required checks passing for V26 ROM-slice wrapper.
03 · Physical Signoff
Antenna/LVS/DRC pass
Latest wrapper and macro hardening runs closed core signoff checks per changelog evidence.
04 · Share Package
33 MB zip
Curated Tiny-LLM ROM-slice handoff archive with checksums and verification reports.
Program architecture
Model contracts and storage decisions are treated as physical architecture choices, not runtime configuration.
Every major claim is tied to run outputs, signoff status, packaging metadata, and scope-aware documentation.
Webapp, control API, runtime API, and pipeline workers provide a reproducible path from model artifact to GDS collateral.
Latest milestones
2026-04-30
EvidenceIntegrated four-ROM reduced Tiny-LLM slice into Caravel top RTL and regenerated wrapper/example GDS with passing hardening and smoke checks.
2026-04-30
EvidenceAudited package scope and documented that the current archive is not full-model-weight compliant, then updated package metadata to prevent over-claims.
2026-04-30
EvidenceAdded generators and tests for literal INT4 ROM output and model-weight scope gating to enforce full-coverage criteria before full-model claims.
2026-04-30
EvidencePublished curated ROM-slice handoff zip with manifests, SHA256 checksums, and report bundles to support external review.
Research atlas
Program sequence
01 · ICsprout Primitive
CF-1 places a real Qwen INT4 row as fixed on-chip ROM with ICsprout55 mapped GDS evidence.
OpenROAD tap/CTS/repair/route, zero DRT, handoff manifest, 90 MHz recommended timing under placement RC.
02 · Contract + Scope
The project now separates reduced-slice demos from full-model claims using explicit scope gates.
Full-model-weight path work introduced contract checks to prevent over-claiming tapeout status.
03 · Hardwired Path
INT4 hardwired ROM generation is now scripted from model-slice artifacts.
Bundle tooling emits per-tensor ROMs, manifests, and image hashes for deterministic reproduction.
04 · Physical Closure
V26 ROM-slice integrated into Caravel user project and closed through hardening checks.
Antenna, LVS, DRC, KLayout loading, cocotb smoke, and local precheck evidence are all captured.
05 · Package Discipline
Handoff archives now ship with manifest, checksums, and explicit model-scope labeling.
Packaging notes distinguish reduced-slice artifacts from any full-model-weight fabrication claim.
06 · Platform Exposure
The frontend can now communicate real run outcomes, not only the static thesis.
Public narrative is aligned to recent evidence from changelog and research notes.
Current posture
Proof-backed, scope-aware communication.
Public + admin split
Open research narrative, protected operator control room.
Public visitors see thesis, milestones, and evidence references. Internal users keep access to run orchestration, control endpoints, and operational diagnostics.